I was unable to visit the construction site last Monday, so imagine my surprise when I stopped by today and saw all the work that had been done. The area around the footings had been filled in with dirt, and the "floor" of the building has been filled in, too. You can see PVC pipes sticking up from the ground, a system hidden under this new dirt that's been added. And while I don't know the official name, there are large concrete pipes lined up at the site, waiting to be installed. Check out some of the pictures below.